Renewal and Modernization of Infrastructure of the Radviliškis – Pagėgiai- State Border Railway Section on the Corridor IA, Stage I
Start date: 2010 November
End date: 2012 October
Value: 23 million euros without VAT
35 kilometres of track will be reconstructed in the Radviliškis - Pagėgiai railway section. It is planned to lay new rails, to correct the width of railway bed in some places, to partially rearrange drainage and crossings, to install water channels, to repair the existing and to install the new aprons and pedestrian crossings, to reconstruct culverts and the lighting system.