Construction of the Gudeliai Tunnel in Vilnius
Start date: 2009 April
End date: 2011 January
Value: 6 million euros without VAT
During the construction of Vilnius city western bypass stage I a 4-lane tunnel (150.57 m long) with widths from 36.42 to 48.29 m was constructed. Metal sheet piling was used to construct the tunnel‘s side supports. The reinforced concrete tracery support makes the tunnel architecturally distinctive.