Installation of Lighting in the Trans-European Network Road E85 (Vilnius – Kaunas- Klaipėda)

Start date: 2007 August End date: 2008 October Value: 0,8 million euros without VAT
Lighting has been installed in a 9.16-metre long road section. The metal galvanised lighting supports were placed on a concrete foundation. Illuminators with sodium bulbs are being used.