Expansion of the Apron at the Kaunas Airport, Stage I

Start date: 2008 November End date: 2009 August Value: 6,4 million euros without VAT
During reconstruction the apron was widened up to 32 thousand m2. A 1068-metre long/46-metre wide main runway and a 200-metre long/46-metre wide connecting runway were constructed. To ensure the airport safety and to be able to carry out the airport maintenance a 918-metre long/4.5-metre wide inspection road was built. A surface water collection system nearly 900-metres long was installed. Before getting into the environment the surface water is cleaned at oil-pollution cleaning facilities with a capacity of 55 l/s. A 4411-metre long drainage was also installed.