Reconstruction of the Bridge over the River Nemunas in Kaunas

Start date: 2012 Januray End date: 2014 June Value: 24,6 million euros without VAT
The bridge in Panemunė will be rebuilt and the current span structure will be replaced by a new steel and concrete span structure on reconstructed supports. The new Panemunė bridge will have 4 lanes and be 20.8 m wide and 273 m long, with the longest span reaching 74.44 m. The steel structures of the beam will be welded on site. Afterwards it will be set up on the river bank and hydraulically hoisted on to the reconstructed supports of the bridge.