Construction of the Vilnius Western Bypass, Stage I. Installation of lighting on the Lazdynai Bridge

Start date: 2008 November End date: 2010 October Value: 0,8 million euros without VAT
During reconstruction of the Vilnius Lazdynai Bridge, street illumination and a trolleybus contact line was installed. The bridge was widened up to eight lanes, instead of the former six. A section of Oslas St. from the Lazdynai Bridge to Erfurtas St. was repaired, and a viaduct on Oslas St- Laivės Ave. was renovated.