Development of the Transport Corridor IA. Contract No. 1/1

Start date: 2010 February End date: 2010 November Value: 3,4 million euros without VAT
The road pavement on the road E77 (A12) of international significance was strengthened and widened in a section from 105 to119.8 km, the bridge across Kražantė River was reconstructed. The traffic safety improvement measure were installed, engineering networks were reconstructed. In Pakražantis settlement the lightning of the road and the pedestrian path was installed.