Development of the Water Supply and Wastewater Networks in Prienai and Jieznas

Start date: 2010 March End date: 2011 Value: 0,7 million euros without VAT
During implementation of this project 4.371-km long water supply and 3.417-km long wastewater networks were installed. The wastewater pump-houses were built in Revuonos Street in Prienai (including a 0.133-km DN80 pressure line) and in a single farmstead of Ignacava (including a 0.325-km long DN80 pressure line) were installed.