Railways

The company constructs and reconstructs railways, constructs platforms and level crossings, installs switches, develops all railway-related infrastructure.

Projects

Construction of the railway line „Rail Baltica“

Start date: 2013 June End date: 2015 January Value: 109 million euros
Implementing the construction of Rail Baltica railway line of international significance in the railway section Šeštokai – Marijampolė the company will construct two different width railway tracks: 34.5 km-long 1,435 mm-broad gauge meeting the European standard, and will reconstruct 35.9 km-long 1,520 mm-broad gauge meeting the Russian standard. »

Construction of the second tracks in the railway line Šiauliai- Klaipėda

Start date: 2012 October End date: 2014 August Value: 78,9 million euros without VAT
In the Western Lithuania, section Šiauliai- Klaipėda, the company builds the second tracks. In total, 22.1 km of railway tracks will be constructed; when making new track formations 0,5 million m3 of the ground will be excavated, and 11culverts will be installed. During reconstruction of the electricity, communication and signalling networks, 140 km of cables will be laid down, heating of switches will be installed, and noise reduction walls will be erected.

Construction of the Second Track in Kyviškės – Valčiūnai section of Vilnius Bypass on the Corridor IX B

Start date: 2011 December End date: 2014 October Value: 62 million euros without VAT
The main objective of the project is to build the second track of the corridor IXB and to divert the train traffic from the Vilnius City centre. A consortium of companies under the management of Kauno tiltai AB will have to finish reconstruction works within 33 months. After reconstruction the freight trains will be able to travel along the bypass which will be 24-km long at a speed of up to 80 km per hour.
All projects »