Kauno Tiltai is the largest transport infrastructure company in the Baltics. The company presents objects it has built in the competition for the Outstanding Product of the Year organised by the Lithuanian Confederation of Industrialists.
Road infrastructure construction Project “Connection of IXB transport corridor (Žirniai str.) and Vilnius International Airport” has been completed within 6 months and was awarded a gold medal at the contest Product of the Year 2013.
During reconstruction of the Jakai roundabout, a four-lane overpass, the longest in Lithuania – 610-metres – was built. It was awarded a gold medal at the contest Product of the Year 2010.
During construction of the missing link of IXB transport corridor, a 380-m long overpass was built. This project received the highest award at the Outstanding Product of the Year 2008 – a gold medal.
During reconstruction of the Kaunas railway tunnel built in 1861, a 108-metre long section was rebuilt. This project received the highest award at the Outstanding Product of the Year 2009 – a gold medal.
Engeniering networks
With the expansion of the water supply and wastewater networks in the town of Rūdiškės 0.953-km long main and 0.197-km long lead-in (branches for connections) domestic wastewater networks were installed. A new domestic wastewater pump-house (NS-4 (Q=7.2 l/s, H=8.8m, N=4.2kW) and a new domestic wastewater cleaning equipment (Q=540m3/d, GE=3217) were built, 0.274- km long lead-in water supply networks and 0.08-km long lead-in wastewater networks were also installed.
During implementation of this project 4.371-km long water supply and 3.417-km long wastewater networks were installed. The wastewater pump-houses were built in Revuonos Street in Prienai (including a 0.133-km DN80 pressure line) and in a single farmstead of Ignacava (including a 0.325-km long DN80 pressure line) were installed.
3.103 km of domestic wastewater network intended for the use in a certain quarter of the city and 473 branches to the residential houses were installed that will be connected to the common city network. 3.295 km of water supply network intended for the use in a certain quarter of the city and 486 lead-in branches were laid. Three local wastewater pump-houses were built and about 95 m of pressure networks.