Kauno Tiltai is the largest transport infrastructure company in the Baltics. The company presents objects it has built in the competition for the Outstanding Product of the Year organised by the Lithuanian Confederation of Industrialists.

Construction of a new road to Vilnius Airport. IXB transport corridor

Road infrastructure construction Project “Connection of IXB transport corridor (Žirniai str.) and Vilnius International Airport” has been completed within 6 months and was awarded a gold medal at the contest Product of the Year 2013.

Reconstruction of the Jakai Roundabout in Klaipėda, Stage I

During reconstruction of the Jakai roundabout, a four-lane overpass, the longest in Lithuania – 610-metres – was built. It was awarded a gold medal at the contest Product of the Year 2010.

Construction of the Missing Link of Transport Corridor IXB

During construction of the missing link of IXB transport corridor, a 380-m long overpass was built. This project received the highest award at the Outstanding Product of the Year 2008 – a gold medal.

Reconstruction of the Kaunas Railway Tunnel

During reconstruction of the Kaunas railway tunnel built in 1861, a 108-metre long section was rebuilt. This project received the highest award at the Outstanding Product of the Year 2009 – a gold medal.

Bridges and Viaducts

Reconstruction of the Vileišis Bridge in Kaunas

Start date: 2008 March End date: 2008 December Value: 4 million euros without VAT
During reconstruction of the 287.55-metre long P.Vileišis Bridge built in 1960, the bridge deck and the metal bridge structures with a total area of over 12,000 m2 were repaired, 534-metre long parapets were erected, the new pavement was laid, the road approaches and cones were arranged. Communication and trolleybus contact networks were reconstructed, the new bridge lighting supports were built.

Bridge B to the Nemunas River Island

Start date: 2007 March End date: 2008 May Value: 2 million euros without VAT
Within a year of building the first bridge to the Nemunas River Island the company built a frame bridge, 60.9-metre long and 14.6-metre wide with three traffic lanes. Abutments were built on reinforced concrete pole foundations. Intermediate steel concrete bearings were fixed in the monolithic reinforced concrete grillage and in the span structure. The span structure is a reinforced concrete monolithic hollow slab with transverse diaphragms at the abutments and intermediate bearings.

Construction of the Pedestrian Bridge in Kėdainiai

Start date: 2006 November End date: 2008 July Value: 0,8 million euros without VAT
A timber arch bridge across the Nevėžis River has been built. The bridge is 75-metres in length and 3.2-metres in width. In addition, a 800-metre long pedestrian path was laid.

Major Repairs of the Aleksotas Bridge in Kaunas

Start date: 2004 March End date: 2005 March Value: 1,7 million euros without VAT
Bearings and pylons of the Aleksotas Bridge, built in 1930, have been reconstructed; new bearing parts were installed; irreplaceable metal structures of bridge opening were cleaned and repainted, new metal structures were manufactured for the former movable part of the bridge. In addition, new lighting poles, steel protective guards, and expansion joints were installed. Length of the bridge is 247 metres, width of the carriageway is 10.5 metres, the total width of the bridge is 15.8 metres.