Construction of a new road to Vilnius Airport. IXB transport corridor

Road infrastructure construction Project “Connection of IXB transport corridor (Žirniai str.) and Vilnius International Airport” has been completed within 6 months and was awarded a gold medal at the contest Product of the Year 2013.

Reconstruction of the Jakai Roundabout in Klaipėda, Stage I

During reconstruction of the Jakai roundabout, a four-lane overpass, the longest in Lithuania – 610-metres – was built. It was awarded a gold medal at the contest Product of the Year 2010.

Construction of the Missing Link of Transport Corridor IXB

During construction of the missing link of IXB transport corridor, a 380-m long overpass was built. This project received the highest award at the Outstanding Product of the Year 2008 – a gold medal.

Reconstruction of the Kaunas Railway Tunnel

During reconstruction of the Kaunas railway tunnel built in 1861, a 108-metre long section was rebuilt. This project received the highest award at the Outstanding Product of the Year 2009 – a gold medal.

All projects

Reconstruction of E85 Vilnius- Kaunas- Klaipėda highway

Start date: 2013 January End date: 2014 January Value: 27 million euros without VAT
The company will reconstruct four sections of the E85 Vilnius - Kaunas-Klaipėda highway. In total, the company will strengthen 25 km of the road surfacing, will reconstruct 2 bridges – across the Ančia and Lokysta Rivers, 3 viaducts, will implement road-safety measures and will reconstruct engineering networks.

Construction of the Pedestrian Bridge in Kėdainiai

Start date: 2006 November End date: 2008 July Value: 0,8 million euros without VAT
A timber arch bridge across the Nevėžis River has been built. The bridge is 75-metres in length and 3.2-metres in width. In addition, a 800-metre long pedestrian path was laid.

Reconstruction of the Trans-European network route E77 (Ryga-Šiauliai-Tauragė-Kaliningrad), II stage

Start date: October 2012 End date: October 2013 Value: 6,7 million euros without VAT
During reconstruction of the trans-European network route E77 Ryga-Šiauliai-Tauragė-Kaliningrad, over 5 km of the roadway surface will be renewed, i.e. from 92.5 km to 98.0 km. The road to be renewed belongs to A II category, has two traffic lanes, each 3.5 m wide. Width of the roadbed - 12 m. Also, the existing power networks and drain system will be renewed in the road section under reconstruction. Viaduct decks in 94,885 and 95.87 km will be replaced.

Asphalting of 10 km section of the Latvian route P36 Rezekne- Gulbene and reconstruction of the bridge

Start date: 2012 September End date: 2013 October Value: 6 million euros without VAT
During 13 months of signing the contact, Kauno Tiltai Company will asphalt a section from 76.30 km to 86.60 km (10 km) on the 1st category route P36 Rezekne- Gulbene, and will reconstruct a metal bridge across the Pededze River.

Construction of a new road to Vilnius Airport. IXB transport corridor

Start date: 2013 April End date: 2013 October Value: 16 million euros
A newly constructed street will connect IXB transport corridor with Vilnius International Airport. By implementing the project, a two-level intersection with connecting roads will be built on Žirniai Street, a street between the viaduct and Tyzenhauzai Street, also sections of A. Gustaitis and Tyzenhauzai Streets will be reconstructed. The total length of bridges and streets- about 3.4 km. It is expected that the newly constructed street in Vilnius will enable to improve communication between the city and the airport. »

Major Repairs of the Aleksotas Bridge in Kaunas

Start date: 2004 March End date: 2005 March Value: 1,7 million euros without VAT
Bearings and pylons of the Aleksotas Bridge, built in 1930, have been reconstructed; new bearing parts were installed; irreplaceable metal structures of bridge opening were cleaned and repainted, new metal structures were manufactured for the former movable part of the bridge. In addition, new lighting poles, steel protective guards, and expansion joints were installed. Length of the bridge is 247 metres, width of the carriageway is 10.5 metres, the total width of the bridge is 15.8 metres.

Trans-European Network Route E85.Construction of the Vilnius Southern Bypass.Contract No.3

Start date: 2011 November End date: 2013 December Value: 21,6 million euros without VAT
During the project Kirtimų Street will be reconstructed from 3.48 km to 7.85 km, and a Street parallel to Kirtimų Street with a pedestrian-bicycle path will be built; also a two level intersection with a viaduct across Kirtimų Street will be installed, a viaduct across the railway and the prospective street, and a two-level intersection at the Kirtimų Street and Eišiškių road with a tunnel under Kirtimų Street will be constructed.

Trans-European Network Route E85. Construction of the Vilnius Southern Bypass. Contract No.2

Start date: 2011 October End date: 2013 November Value: 20 million euros without VAT
During the project Kirtimų Street in Vilnius (from 2.08 km to 3.48 km) and a Street section with acceleration-deceleration lanes in Galvės Street will be reconstructed. In addition, a new Street parallel to Kirtimų Street with a roundabout to Granito Streets will be built; also a two-level intersection of Kirtimai-Galvė Streets and a two-level intersection of Kirtimų Street with the railway and a pedestrian-bicycle viaduct, as well as a scaffold bridge over the railway and a roundabout with Fermentų Street will be built.

Reconstruction of A. Juozapavičiaus Avenue

Start date: 2011 June End date: 2012 December Value: 10,9 million euros without VAT
A 2.6-km long section of the Avenue from Karaliaus Mindaugo Avenue to the Panemunė Bridge will be reconstructed by widening it up to 14 metres. In addition, the footways, the traffic lights and the rainwater discharge system will be renewed.

Reconstruction of the Trans-European Road E85 (Vilnius-Kaunas-Klaipėda). Pavement Reconstruction. Contract No.3, part I and II

Start date: 2010 July End date: 2010 December Value: 11,6 million euros without VAT
Based on the first and second construction contracts, asphalt pavement in certain sections of the highway A1 Vilnius–Kaunas–Klaipėda were strengthened, the deck of viaducts at Vincentava, Pagrybis and Endrejavas intersections were replaced. Lighting was installed in a viewing point located in 216.95–220.30 km.